
Dear all, Third and Final Project review for final year UG students are planned on 28th – 30th. List is enclosed with this mail. Students should bring full demo with final ppt with guide initial in project diary. Students should meet the guide before final review atleast 3 times and it should be initial by guide in the project diary. Student should also submit the sample project document initial by their respective guide. Sample project report is attached with this mail. Project diary and abstract (hard copy) should be submitted on that day without fail. Final ppt is as follows:
I slide – Title with student name and guide name
II slide – Abstract ( Only points )
III slide – Problem defn
IV Slide – Existing and Proposed system
V slide – Architecture Diagram
VI Slide – Overall Module Description
VII slide – Module 1 Description
VIII slide – Module 1 Snapshot
Continue the VII and VIII slide content for rest of the modules
IX slide – Conclusion
X slide – References ( Atleast 6 ). Students should able to answer.
The post Final Under Graduate Project Review appeared first on Free Student Projects.